Buzzard Roof Work 8/23/2024 – 10/23/2024
BUILDINGS OR AREAS INVOLVED:
Shingled penthouse roofs of Buzzard Hall
CONSIDERATIONS:
The small parking to the south in the photo below will be taken offline and used for staging. When work is going on near entrances/exits, the contractor will use spotters on the ground to ensure safe passage. There will be a crane set up on the west side of the building. We have been assured it is safe to work in the building while the crane is in use.