Lumpkin Basement Restroom Closure:  

REQUESTED BY:  Aaron Kemper, Plumber Foreman  

BUILDINGS OR AREAS INVOLVED:  Lumpkin Hall, Basement restrooms (Men’s & Women’s) 

DATE/TIME:  7:00 a.m. Monday, November 21, 2016 – Wednesday, November 23, 2016 3:00 p.m.            

PURPOSE OF PROPOSED OUTAGE:  Changing out sewage pumps  

POSSIBLE PROBLEMS / SPECIAL CONSIDERATIONS:  Both the Men’s and Woman’s restroom in the basement of Lumpkin will be closed while the sewage pumps are being replaced.  Restrooms will be available on all other floors.  

Contacts in Case of an Emergency or Significant Change in Duration or Scope: 

Lumpkin Hall – Mahyar Izadi, 581- 3526

 

Cell Tower Work:  

REQUESTED BY:  Lionel Sanders, Facilities Planning & Management  

BUILDINGS OR AREAS INVOLVED:  Cell Tower by Buzzard Building  

DATE/TIME: Monday, November 21, 2016 – Wednesday, November 23, 2016 (3 days)

                     Monday, November 28, 2016 – Tuesday, November 29, 2016 (2 days)               

PURPOSE OF PROPOSED OUTAGE:  Antenna installation completion  

POSSIBLE PROBLEMS / SPECIAL CONSIDERATIONS:  Technicians will be inside the cell tower fenced in area completing work.  A ground safety person will be provided at site should any issues arise.  

Contacts in Case of an Emergency or Significant Change in Duration or Scope: 

Buzzard Bldg. – Doug Bower, 581-2200

 

Pemberton Hall tuckpointing work:  EXTENDED 

REQUESTED BY:  Tony Craven, Brickmason Foreman  

BUILDINGS OR AREAS INVOLVED:  Pemberton Hall  

DATE/TIME:  Tuesday, November 1, 2016 – Wednesday, November 23, 2016  

PURPOSE OF PROPOSED OUTAGE:  Tuckpointing on the outside of building – West side  

POSSIBLE PROBLEMS / SPECIAL CONSIDERATIONS:  Brickmasons will be working on the West side of Pemberton Hall.  A man lift will be used.  Occupants are advised to close windows and curtains. Please be aware there will be workers OUTSIDE your windows. Occupants are advised to use caution to ensure their privacy. 

Contacts in Case of an Emergency or Significant Change in Duration or Scope: 

Pemberton Hall – Matt Brown,  581-7717

 

Coleman Hall Restroom work: 

REQUESTED BY:          Eric Wahls, Facilities Planning & Management 

BUILDINGS OR AREAS INVOLVED:     Coleman Hall men’s and women’s Southwest restrooms on 1st and 2nd floors. 

DATE AND TIME:        Thursday, July 23, 2015  - project duration

PURPOSE OF PROPOSED OUTAGE:   Repiping project 

POSSIBLE PROBLEMS / SPECIAL CONSIDERATIONS:    Men’s and women’s Northeast restrooms on all floors (1st, 2nd & 3rd) will be open during this work in the Southwest restrooms.  There will be some construction noise associated with this work, but it will be kept to a minimum.  If at times there would be any extra loud construction noise, we will try to schedule with advanced notice and do early in the morning before classes. 

Contacts in Case of an Emergency or Significant Change in Duration or Scope:

Coleman Hall – Stephen King, 581-2016

 

McAfee Elevator Work:  

REQUESTED BY:  Eric Wahls, Facilities Planning & Management  

BUILDINGS OR AREAS INVOLVED:  McAfee parking lot, South side of McAfee and sidewalk on the South side of McAfee  

DATE AND TIME:  Beginning Tuesday, May 26, 2015 through duration of McAfee elevator work

PURPOSE OF PROPOSED OUTAGE:  Construction, staging area & path for installation of new elevator 

POSSIBLE PROBLEMS / SPECIAL CONSIDERATIONS:  Seven (7) parking spaces, including 2 ADA spots in the Southeast corner of McAfee parking lot will be taken as part of the construction/staging area.  Three (3) parking spaces immediately to the West will be taken to make two (2) temporary ADA parking spaces.  

Contacts in Case of an Emergency or Significant Change in Duration or Scope: 

McAfee Gym – Bill Higelmire, 581-6344

 

Student Services Bldg. Entrance Closure:

REQUESTED BY: Eric Wahls, Facilities Planning & Management

BUILDINGS OR AREAS INVOLVED: Student Services Building, South East / Financial Aid Entrance

DATE & TIME: Starting Tuesday, March 17, 2015 around noon and continuing through the duration of the construction work.

PURPOSE OF PROPOSED OUTAGE: Construction work for installation of new elevator.

POSSIBLE PROBLEMS / SPECIAL CONSIDERATIONS: The South East entrance and stairwell will be closed for construction. The Office of Financial Aid will be accessible from the set of double doors farther to the East end of the building facing the parking lot on the South.

 

 

 

 

 

 